Products

Sectional Jack Up Barge

As a professional China manufacturer and supplier, Shandong Haiding Shipbuilding Co., Ltd. specializes in producing high-quality Sectional jack up barge with stable performance and strict quality control. Our factory is equipped with advanced production lines and an experienced technical team, ensuring every product meets international standards and buyer requirements.Contact us today to get a fast quotation and professional support from a reliable China factory.


HAIDING SHIPYARD Sectional jack up barge is a heavy-duty modular equipment designed for 3-100m marine water depth, with spud leg design length of 10-150m and total platform load capacity of 3000 tons, covering eight types: geological exploration, hoisting, excavation, maintenance, general operation, drilling, wind farm installation and living quarter. Aiming at the pain points of deep-sea engineering such as "large load demand, multi-scenario adaptation and complex environment operation", it achieves full water depth coverage from shallow sea to deep sea (3-100m) through sectional truss spud legs (up to 150m long), hydraulic rack-and-pinion lifting system (3000 tons load capacity) and modular functional cabins. It can complete high-end operations such as geological sampling, wind power hoisting, marine drilling and platform maintenance, with platform full-load leveling accuracy of ±0.1° and wind resistance grade up to 12, providing a "one-stop, full-functional, high-stability" operation carrier for marine engineering.



Product Advantages and Features


1.Ultra-high Load Design: The total platform load capacity reaches 3000 tons, deck uniform load ≥80kN/㎡, and local concentrated load can bear 500 tons (adapted to large drilling equipment and wind turbine main engine hoisting), far exceeding traditional jack-up platforms (load ≤1500 tons);

2.Full Water Depth Coverage: Adapted to 3-100m water depth operations, spud legs adopt sectional truss structure with customizable length of 10-150m, insertion depth into seabed ≥8m, and can stably berth in shallow sea (3-20m), medium sea (20-50m) and deep sea (50-100m). The spud can contact area ≥50㎡ (preventing sinking into soft soil layer).

3.Full Coverage of Eight Functional Types: Geological exploration, hoisting, excavation, maintenance, general operation, drilling, wind farm installation and living quarter platforms can be customized according to operation needs. Functional cabin modules (exploration cabin, hoisting cabin, drilling cabin) can be quickly disassembled and assembled, and a single platform can switch more than 3 operation modes;

4.Special Equipment Integration: Wind farm installation platform can be equipped with 800-ton marine crane (360° slewing), drilling platform with 5000m deep well drill, and living quarter platform can accommodate 100 people (including dormitory, canteen and office area), realizing integration of "construction + living + storage".

5.Sectional Transportation & Assembly: The platform is split into 5-8 sections (main platform section, spud leg section, functional cabin section), with maximum single section weight ≤100 tons, which can be transported by semi-submersible ships and ocean-going barges for deployment in global sea areas; on-site assembly is completed with flanges + prestressed bolts and marine floating cranes, with assembly cycle ≤15 days;

6.Modular Maintenance: Core components (lifting cylinders, cranes, drills) adopt modular design, which can be disassembled and replaced as a whole in case of failure, reducing maintenance time to 12 hours/time; the spud leg rack is made of wear-resistant alloy steel (hardness ≥400HB) with a service life ≥20 years in deep-sea environment.

View as  
 
Jack Up Living Quarter Platform

Jack Up Living Quarter Platform

Looking for a reliable China manufacturer and supplier? Look no further! Shandong Haiding Shipbuilding Co., Ltd. is a leading factory offering high-quality Jack up living quarter platform. HAIDING SHIPYARD Jack up Living Quarter Platform is a heavy-duty living support equipment designed for 3-100m marine water depth, with spud leg design length of 20-100m and total platform load capacity of 3000 tons. It core-integrates a 100-person modular living cabin (accommodation, catering, office), medical support module, and emergency rescue system, focusing on long-term personnel residency (30-180 days) and living support tasks for offshore oil and gas fields, wind power platforms, and deep-sea engineering. Aiming at the pain points of marine living such as "poor comfort, difficult supply, and high safety risks in complex sea conditions", it realizes integrated support of "living + office + medical + emergency" through CCSB steel plate rigid structure (yield strength ≥235MPa), constant temperature and humidity environment control, and wind-wave resistant stable design (Grade 11 wind resistance). The personnel living comfort reaches 90% of onshore standards, and the supply cycle is extended to 30 days, providing a "highly comfortable, highly reliable, highly safe" living solution for marine engineering.
Jack Up Wind Farm Installation Platform

Jack Up Wind Farm Installation Platform

Shandong Haiding Shipbuilding Co., Ltd. is a famous Jack up wind farm installation platform manufacturer and supplier in China. If you want to buy high-quality and the newest products, please contact us immediately. HAIDING SHIPYARD Jack up working platform is a heavy-duty wind power construction equipment designed for 3-100m marine water depth, with spud leg design length of 50-150m and total platform load capacity of 3000 tons. It core-integrates an 800-ton class 360° slewing crane, wind power foundation leveling system, and tower barrel/main engine docking module, focusing on three core tasks: offshore wind power pile driving, tower barrel splicing, and installation of 16MW and above wind turbine main engines. Aiming at the pain points of wind power installation such as "large-tonnage hoisting demand, high-precision docking requirements, and strong interference from complex sea conditions", it realizes stable wind power installation operations from shallow sea to deep sea through CCSB steel plate rigid structure (yield strength ≥235MPa), full-automatic platform leveling (±0.05°), and strong wind-wave resistance design (Grade 12 wind resistance). The installation cycle of a single wind turbine is ≤72 hours, 40% more efficient than traditional floating cranes, providing a "high-load, high-precision, high-efficiency" installation solution for large-scale offshore wind power development.
Jack Up Drilling Platform

Jack Up Drilling Platform

Shandong Haiding Shipbuilding Co., Ltd. is a professional leader in China in Jack up drilling platform manufacturing with high quality and reasonable prices. Welcome to contact us. HAIDING SHIPYARD Jack up Drilling Platform is a heavy-duty oil and gas drilling equipment designed for 3-100m marine water depth, with spud leg design length of 30-150m and total platform load capacity of 3000 tons. It core-integrates a 5000m deep well drilling system, high-precision wellbore control module, and mud circulation treatment system, focusing on three tasks: deep-sea oil and gas field exploration drilling, old oilfield development well operations, and emergency rescue drilling. Aiming at the pain points of marine drilling such as "difficult deep well control, high wellbore accuracy requirements, and strong interference from complex sea conditions", it realizes stable drilling operations from shallow sea to deep sea through CCSB steel plate rigid structure (yield strength ≥235MPa), full-automatic platform leveling (±0.05°), and strong wind-wave resistance design (Grade 12 wind resistance). The drilling efficiency is 25% higher than traditional platforms, and the wellbore verticality deviation ≤0.5‰, providing a "high-reliability, high-precision, high-efficiency" drilling solution for marine oil and gas development.
Jack Up Working Platform

Jack Up Working Platform

HAIDING SHIPYARD Jack up Working Platform is a universal operation equipment designed for 3-100m marine water depth, with spud leg design length of 10-100m and total platform load capacity of 3000 tons. Focusing on "modular functional cabins + flexible adaptation", it covers four scenarios: general marine engineering construction, temporary equipment storage, marine emergency operations, and scientific research monitoring support. Aiming at the pain points of traditional dedicated platforms such as "single function, poor scenario adaptability, and long deployment cycle", it realizes "one platform for multiple uses" through interchangeable operation modules (hoisting/storage/construction), high-precision leveling (±0.1°), and wind-wave resistance design (Grade 11 wind resistance). The operation switching time is ≤48 hours, providing a "flexible, efficient, low-cost" universal operation solution for marine engineering.
Maintenance Self-elevating Platform

Maintenance Self-elevating Platform

HAIDING SHIPYARD is a long-term Maintenance Self-elevating Platform supplier, we guarantee quality while offering reasonable prices and reliable service support. HAIDING SHIPYARD Maintenance Self-elevating Platform is a professional maintenance equipment designed for 3-100m marine water depth, with spud leg design length of 20-100m and total platform load capacity of 3000 tons. It core-integrates three modules: maintenance workstation, diving operation cabin and equipment storage cabin, focusing on four tasks: offshore platform equipment maintenance, submarine pipeline inspection and repair, wind power platform maintenance, and emergency repair. Aiming at the pain points of marine maintenance such as "unstable operation surface, difficult equipment adaptation, and strong interference from complex sea conditions", it realizes stable maintenance operations from shallow sea to deep sea through high-precision platform leveling (±0.1°), modular integration of maintenance equipment, and wind-wave resistant operation design (Grade 11 wind resistance). The maintenance cycle is 50% shorter than traditional floating ships, providing a "high-stability, high-adaptability, high-efficiency" maintenance solution for marine engineering.
Excavation Self-elevating Platform

Excavation Self-elevating Platform

Shandong Haiding Shipbuilding Co., Ltd. is an experienced China factory, manufacturer, and global supplier of Excavation Self-elevating Platform, serving international buyers for many years. HAIDING SHIPYARD Excavation Self-elevating Platform is a heavy-duty excavation equipment designed for 3-100m marine water depth, with spud leg design length of 10-90m and total platform load capacity of 3000 tons. It is core-equipped with a 200-ton class full-hydraulic underwater excavator, focusing on four tasks: deep-sea waterway dredging, seabed earth-rock excavation, artificial island foundation leveling, and seabed obstacle clearance. Aiming at the pain points of marine excavation such as "difficult depth control, low operation accuracy, and strong interference from complex sea conditions", it realizes stable excavation operations from shallow sea to deep sea through high-precision excavation positioning (±0.3m), full-automatic platform leveling (±0.1°), and wind-wave resistant excavation system (Grade 11 wind resistance). The daily excavation volume reaches 5000m³, with efficiency 30% higher than traditional dredgers, providing a "high-precision, high-efficiency, high-stability" excavation solution for marine engineering.
HAIDING SHIPYARD is a famous Sectional Jack Up Barge manufacturer and supplier in China. If you want to buy high-quality and the newest products, please contact us immediately.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept